Here's how it all happens:

HOUSE PREPARATION

Dig down around and under the house


Take out the pipes and wires to make way for the steel


Cut down that chimney top


That one too


Cut the walls and roof


Start putting that steel under the house and 2 chimneys


Left PICS are on the ground Right PICS are in the air
Lift the kitchen


Lift the front, looking from back right


looking from back left


from the front


Front of house up 3 feet Under front of house
Rolls easy on two beams About 40 feet away

 
1690 house exposed 1720 exposed face

 
1720 section cut 1690 section cut

 
1720 section ready to roll to new site

 
 
Payne Construction
Center Strafford, NH
Brian
The MASTER Mover

MORE TO COME SOON


January 28, 2007