Who We
Are
When
We Meet
Get
Involved
Map Of The
Trail
List Of
Trails
Recent
Press
Other
Area Trails
Learn
About Trails
Sponsor
Links
Contact
Us
|
Advocating
non-motorized transportation methods connecting the Brighton Millpond,
Imagination Station, Yum Yum Tree, Dairy Queen and public bathroom
to bikepaths in surrounding townships, Metroparks and Island Lake
State Park, as part of network of bikepaths from Chicago to Boston.
We are working with City
of Brighton officials to create these bikepaths:
West from downtown Brighton to
Brighton High School (perhaps via Lindbom Elementary), to Genoa
Township's safety path that goes past Maltby Middle School, north
to Mt. Brighton and south to Brighton State Park, Hamburg, Ore Lake,
and soon connections to Dexter and eventually Chicago. For
2006.
To do this, we could contract to paint on-street bikepath from Millpond/Imagination
Station/bathrooms, north on 1st Street, over the hump at Chestnut,
north on 1st, west on Walnut across the railroad tracks (with signal),
south on 4th Street, west on State Street (or past Lindbom Elementary—can
serve kids walking to school, too?), south on 7th Street, connecting
to the Genoa Township safety path. Or we could build new
railroad crossing from Cedar to State Street, with paint on-street
to the Millpond, west on State Street (or past Lindbom Elementary),
south on 7th Street, connecting to the Genoa Township safety path.
South from downtown Brighton to Scranton
Middle School. For 2006.
To do this, we could contract to paint on-street bikepath from above
bikepath, south on 3rd St., continuing on Fairway Trails, to existing
painted bikepath on Peppergrove and existing safetypath to Scranton
Middle School.
East from downtown Brighton to Island
Lake State Recreation Area (map),
and connections to Kensington
Metropark and South Lyon and eventually to Port Huron and Boston.
For Green Oak Township in 2006-8.
To do this, we could build along Grand River or the CSX access road,
crossing US-23 next to Grand River or stand-alone bridge at Maltby
Road, then connect to the approved Green Oak safety path along southern
boundary of the new mall and into Island
Lake State Recreation Area.
North (1) from downtown
Brighton to Meijer Skate Park and Brighton District Library.
For 2006.
To do this, we could contract to paint on-street bikepath from
Millpond/Imagination Station, north on 1st Street, over the hump
at Chestnut, north on 1st, west on Walnut, north on 2nd Street,
along the Meijer road by their gasoline station, and west on Meijer
Drive to the Skate Park and library.
North (2) from downtown Brighton to approved
Brighton Township trails along Hilton and Hunter Roads. For
2007.
To do this, we could go over existing boardwalk, to a new painted
crossing of Grand River, along the Upper Millpond, up Flint Road,
over I-96 at Flint Road.
Northwest from downtown Brighton to Howell.
For 2007-8?
Via Grand River, under I-96, to existing Genoa Township safetypaths?
Take the West route to Maltby MS, north to Mt. Brighton, then on
via Challis and Dorr Roads?
Come help us make this happen! Contacts: Eric Piehl
Phone: (810) 343 8023
Email: eric.piehl@gmail.com
Jim Fackert
Phone: (810) 231-3471
Email: jfackert@cac.net
Friends Of Brighton Trails 10470 Rushton Rd. South Lyon, MI 48189 |