![]() Model Bridge Team's FAQ's 2006 - NEW!!! STARTING 1/24/2005 -- The Ralph Salvucci Online Bridge Design Contest (A subcontest within the West Point / ASCE Bridge Design Contest) Current Local Online Contest Scoreboard 13th Annual BSCES/MassPEP Model Bridge Competition
| |
Welcome to the Model Bridge Contest Web Site! The 2007 contest kicks off TODAY! To register, CLICK HERE. Here are LAST YEAR's results without names. I am your Contest Coordinator, Reed Brockman, and you can feel free to e-mail me with any questions you may have. I hope everyone can make it to the Curry Student
Center at 4 pm on October 16th to hear Celeste Baine's presentation and
the kickoff. The contest will take place at the Curry Student Center at Northeastern University on Saturday, February
3rd.
Silver Level Sponsors Vanasse Hangen & Brustlin, Inc. Bronze Level Sponsors CBI Consulting, Inc. Coler & Colantonio, Inc. Howard/Stein-Hudson Associates Vollmer Associates LLP Bagels provided by: Pizza provided by:
A Cooperative effort by The Boston Society of Civil Engineers' Infrastructure Group, Massachusetts Pre-Engineering Program (MassPEP) and Northeastern's NUPrime Program
Platinum Level Sponsor |
38 TOTAL BRIDGES Tested Ultimate Load
1st Place BLS-5 Boston Latin
School, 46.6 lbs. Aesthetic Design 1st Place ARL-3 Arlington High School ARL-3 is the winner of the Othmar Ammann Award, for the highest strength bridge of the top 3 most aesthetic. The webmaster is itching to post photos -- get those
permission slips in! |