Herman's Factory Five Racing 65' Roadster Build SiteHome | Introduction | Monthly Journal | Running Costs| 91' Mustang GT 5.0 Donor | Engine Specifications | Links | E-Mail | 1998 Passat Project |
April 2007
I did note that once in position, the visible edge seemed to be about 1/8" further up the radiator's bottom than I had anticipated. I will probably trim down the leading edge to allow it to move down a bit more. As you can see in the pictures, there's still a lot of scratches to be worked out, but I'm sure it'll work out fine. Time to buy some Scotch-Brite!
|