Taking a cue from Thomas Christophe, I feel a journal format might be
better suited for my site.
|
|
Buying the Donor 91' Mustang.
|
|
|
Budget, Storage Shed & T-Bird IRS w/calipers.
|
|
|
Edelbrock Cyl. Heads, Summit Racing First Purchases
& Donor Strip-down
|
|
|
More Donor Removal, 2000 Mustang spindles/brakes,
331 Short Block |
|
|
New Tools, Sandblasting donor parts |
|
|
Rear T-Bird Hub carrier refurbish, T5 inspection. |
|
|
Gaskets, Oil Pan, Some T5 work |
|
|
Misc. Parts, Timing Chain Cover. |
|
|
Starting on Cyl. Heads, CompCam Kit, Holly Carb |
|
|
More headwork and preliminary valvetrain work, engine
mock-up. |
|
|
Initial Engine buildup, tons of measuring tolerances,
port-matching heads |
|
|
Completed port-matching; engine finally built! |
|
|
Waterpump, timing pointer, throttle return spring,
dismantling IRS |
|
|
Parking brake modification. |
|
|
Fuel Tank refurbishing. |
|
|
Completed fuel tank refurbish, checking for cooling
leaks, pedal box refurbish, IRS pumpkin refurbish, March pulley
installation, setting initial timing.
|
|
|
Completed IRS refurbish - installed new 3:55 gears
and T2 Torsen Differential
|
|
|
Refurbished Rear Brakes and Front PBR Caliper work. |
|
|
MC fittings, Driveline items ( scattershield, fork,
cable, quadrant, TOB, & clutch ) |
|
|
Engine Cradle, Initial Driveline assembly/spec'ing,
installing main oil seal and oil galley transistion plug - tested
oil pump for the first time. We have lubrication!!! |
|
|
Finish up dialing in bellhousing and assembly for
clutch system and T5. |
|
July 2005
|
Fuel Tank; Cartech fuel pickup, Fuel Pump,
Fuel Reg., Aeroquip fittings. |
|
|
Steering Rack, odds and ends. |
|
|
Testing mini starter, Russ Thompson gas pedal. |
|
|
Purchased the FFR MkIII 65'
Roadster, received
Halibrand Cobra III rims and Nitto NT555 Drag Radials. |
|
|
FFR MkIII DELIVERED! Initial Build Begins! Front and
rear suspension installed, fuel tank installed, radiator installed,
passenger foot box completed, driver foot box 50% completed, pedal
box and Russ Thompson gas pedal installed, dash holes for Autometer
gauges cut out, started on passenger and driver side main cockpit
panels. |
|
|
Breeze Seat Bracket work, Brake system completed,
front suspension completed, driver side floorpan riveted. |
|
January 2006
|
Fuel System installation, engine installation. It's a ROLLER!
Engine/tranny installed into the frame for the first time!
Removed fuel system; installing FFMetal battery box so it's back
to the drawing board for the fuel pump and filter! :(
|
|
|
FFMetal Battery Box Installation, Heater and MSD6AL
placement, removal of material from Lakewood bellhousing, Engine Wire
Loom routed, Ground points installed, passenger side floor panel and
Breeze seat bracket riveted in, rear-most trunk panel rived in, and
final dash layout and drilling completed. |
|
|
Finished up details of all wiring looms in the car.
Plumbed mini-heater. Repaired tail housing seal. Finishing up various
details prior to mounting the body. |
|
|
Body mounted and delivered to SRP for paint. Pre-drilled all illumination
mounting holes.
Dash pad glued and gauges mounted permenantly. Tested I-Squared
Power Manager/Master Controller. Dash now "permanently"
mounted.
|
|
|
Waiting for body back from SRP. Brakes w/parking brake cables completed!
Reserved CA personalized plates: "SNKVNNM" (Snake Venom)
SNKVNNM's first engine start and go-kart the same day!!!
|
|
|
Engine Teardown - unbalanced motor! Ordered new CHP
347 all forged short block! New motor build up. |
|
|
CHP 347 - Completed Build. Reinstalled into the FFR. GO-KART again
and it's a SUCCESS! Installing insulation and carpeting.
|
|
|
Finished 90% of the carpeting. Roll-Bars Drilled. Rear
Electrical Harnesses Completed. Misc. items taken care of (dash stiffening,
vent hose, etc.) Body is PAINTED by SRP!!! |
|
|
9/9/06 - Body Mounting Day! |
|
|
Final Details: Getting VIN (CHP), Smog Exemption (B.A.R.),
Brake & Lamp Inspection, Added brake-duct grills, wired (temp.)
license plate illumination, installed quick-jacks and visors. |
|
|
California Registration Completed. "SNKVNNM" plates attached
with stickers. New Barry Grant "Might Demon" and proper
carburator tune w/distributor recurve.
|
|
|
Happy Holidays! |
|
|
Happy New Year!
|
|
|
Door Seals, Aluminum Spats,
Dyno Results (with Video)
|
|
|
The first 1,000 miles
and the ride with my wife! Radiator front shroud fabrication started.
|
|
|
More work on the radiator
front shroud. Discovered Ron Davis radiator is leaking!
|
|
|
Progress on the front
radiator shroud; new Ron Daivs radiator installed.
|
|
|
"Cobra" Emblems installed,
License plate illumination now completed, roll-bar trim rings
installed,
Bilstein shock broke!!! NEW KONI's from Levy Racing to replace
them!
|
|
|
Summer of 2007 Fun - San
Leandro Kit Car Show, End of the Summer Run, Cisco Car Show
|
|
|
Replaced cracked windshield..
Replaced quadrant with Forte's quadrant.
|
|
Nov.-Dec. 2007
|
Nothing to report in November. December,
received and installed DWC wind-splitter. Installed Finishline Overrider
grommets (front.) |
|
|
Ongoing Yearly Journal
|
|