|
1. Track will be two track, with a “Main One” and “Main Two.”
2. There will be crossovers appropriate for switching from right hand to left hand running.
3. The area to be represented will be Joliet, Illinois to Streator Illinois.
4. I might “fudge” a little in providing additional sidings at locations along the railroad that were in place 50 years ago but no longer exist today in order to provide some opportunities for operation activities.
5. Mainline switches would be controlled by a dispatcher.
6. Local switches would be controlled at the layout.
|