Check out photos from the property, the area, and the progress.
WINTER 04
SPRING 05
SUMMER 05
FALL 05
FALL 2005, view from the cabin
The cabin location fixed and the foundation is in
Frost wall for the deck and basement framing
The main section of the walk-out basement
The master builder finishes up on the sub-floor
And, the log walls go up – a look from the inside
From the outside
From the porch into the main cabin
The assembly of the post and beam trusses
It looks like a cabin - from the north-east corner
And from the north-west corner
The wrap-around deck is added
And the tongue & groove component of the root
Looking good from the front yard
Some roof detail
From the inside looking forward
From the inside looking back
Insulation, ventilation, and ice/water shield
Sun lowering on western exposure