|

|
|
Packages arrive
from Monitoring Times - Feb. 7, 2008
L-R KC2JPP, N3GZ,
N2LTQ
|
|

|
|
KC2JPP
& N3GZ actually read the manual!
Feb. 7, 2008
|
|

|
|
The
three modules donated by Monitoring Times.
Feb. 7, 2008
|
|

|
|
Take a peek
inside the controller.
Feb. 7, 2008
|
|

|
|
At the
repeater site, KC2JPP mounts modules.
Feb. 8, 2008
|
|

|
|
N2EWT
inspects the progress.
Feb. 8, 2008
|
|

|
|
L - R
KC2JPP, N3GZ & N2EWT
Feb. 8, 2008
|
|

|
|
N2LTQ
& KC2JPP
Feb. 8, 2008
|
|

|
|
KC2JPP
unpacks the 440 module from KJI Electronics.
Feb. 10, 2008
|
|

|
|
N2LTQ with 60 amp. power supply
from KJI Electronics.
Feb. 10, 2008
|
|

|
|
N2CSA
throws the switch on the first power up.
Feb. 10. 2008
|
|

|
|
N2LTQ
programs the controller.
Feb. 10, 2008
|
|

|
|
Testing
1.2 gig from Douglass Park, Lower Twp.
L-R N2Ltq, KC2JPP,
N2CSA - Mar. 28, 2008
|
|

|
|
N2LTQ
assembles a GP-95.
Mar. 28, 2008
|
|

|
|
N3GZ
steadies the antenna mast.
Mar. 28, 2008
|
|

|
|
L-R Rick
Connor, WC2K, of Connor Towers and KC2JPP during antenna
installation. - Apr. 12, 2008 |
|

|
|
D-Star
antenna installation - Apr. 12, 2008
L-R KC2JPP, KC2ONQ,
N3GZ, N2LTQ
|
|
|
|
N2LTQ, KC2JPP and
WC2K during antenna preparation.
Apr. 12, 2008
|
|
|
|
WC2K
preps a GP-98.
Apr. 12, 2008
|
|

|
|
WC2K
mounts a GP-98 triband.
Apr. 12, 2008
|
|

|
|
WC2K
mounting a GP-95 triband.
Apr. 12, 2008
|
|

|
|
KC2JPP
relays SWR readings to WC2K.
Apr. 12, 2008
|
|
|
|
KC2JPP & WB2JJO view
2 m activity with a
service monitor. July 27, 2009
|