![]() |
||
MISC | ||
MISC | ||
MISC | ||
MISC | ||
MISC | ||
MISC | ||
MISC | ||
MISC | ||
MISCMISC | ||
MISC | ||
MISC | ||
| Set
& Production Pictures Page 2 | ||

The
orchestra pit in a small alcove to the side




Above:
Notice the black 1/4 inch thick angle iron under the bedroom floor...
Below: and the 1/4 inch thick steel plate spanning the 'front' of the bedroom
floor - nothing's to good for the safety of our actors.
Not enough thanks can be said to the Girards! My heroes and heroines! This
set would not be built if not for them!

Two
generations of Girards - our amazing set builders!

Above: rehersal on the as yet unfinished set.
Below: more rehersals on the 'a bit more finished' set.
Notice the small 'window' on the left wall. Mr. Blakeslee looked through
it
and was the only one who could see what was going on the set for cues until
Friday where we had a tv/vcr setup back there to record the production.
We actually made 2 'windows' for a better view...



A base
coat of paint & an upstairs wall & new proper fireplace. The set model
sits on the floor in front.
We almost put the band in front of the stage as has been done in previous
productions (more off to the side actually)
but the band was too big and blocked too much...

All content © 2005
- 2007 Jim Lassiter
This site best viewed at 1280 x 1024