1970 VW Restore

 

 

LAVA - Lower Alabama Volkswagen Association

Mobile, Alabama   http://clublava.org

Below are video clips and pdf files of Malcolm Beasley 1970 VW Convertible Restore #2, Summer 2011

The work time shown are the actual work time. Time spent researching and ordering parts and performing this documentation is not included. Minor workshop cleanup is included, but every so often during the project, Malcolm had to perform a major workshop cleanup which is not included. There is a companion text file (pdf) of this restoration that matches the video clips. Remember Malcolm is an amateur so use this guide at your OWN RISK! The procedures are just how I did it and may not be the preferred way of performing the task.           Enjoy!

Questions to malcolmbeasleysr@comcast.net

Video Links

Video Clip

Duration

(Minutes)

Companion Text File (pdf)

Right Click to "Save As" on your Computer

Time Expended

(To Date)

#1 Introduction 6-15-2011 3:50 Introduction to Restoration #2 _
#2 Floor Pan - Interior Removal 6-18-2011 3:06 Removing the Interior of VW 3 Hours
#3 Floor Pan - Demolition 6-22-2011 6:00 Removing the Floor Pans of VW 14 Hours
#4 Floor Pan - Demolition Continued 6-30-2011 5:24 Removing Door Panels, Dash etc. 28 Hours
#5 Gas Tank Removal, Clean & Seal, Re-Installing 7-6-11 8:16 Removing, Cleaning, Sealing & Re-Installing Tank 44 Hours
#6 Floor Pan - Installation 7-15-2011 9:25 Installing the Floor Pan in VW 72 Hours
#7 Refurbishing Under the Gas Tank Area 7-19-2011 3:30 Refurbishing the Area under the Gas Tank 85 Hours
#8 Floor Pan - Welding 7-31-2011 9:36 Floor Pan Welding in place 105 Hours
#9 Misc. Clean-up and Removing Fenders 8-9-2011 11:03 Misc. Clean-Up Items and Removing Fenders 126 Hours
#10 Wheel Well Undercoating 8-13-2011 1:37 Wheel Well Undercoating 132 Hours
#11 Fender Repair 9-13-2011 8:07 Fenders Repair 181 Hours
#12 Deck Lid Repair 9-26-2011 8:45 Deck Lid Repair 201 Hours
#13 Hood Repair 9-27-2011 2:45 Hood Repair 224 Hours
#14 Window Removal 9-28-2011 6:40 Window Removal 240 Hours
#15 Convertible Top Removal 9-29-2011 8:11 Convertible Top Removal 245 Hours
#16 Protecting Door Inside & Behind Rear Seat 9-30-2011 1:27 Protecting Door Inside & Behind Rear Seat 250 Hours
#17 Front Apron Repair 10-4-2011 1:55 Front Apron Repair 258 Hours
#18 Rear Apron Repair 10-5-2011 1:41 Rear Apron Repair 268 Hours
#19 Sanding Body 10-6-2011 4:47 Sanding Body 288 Hours
#20 Paint Car - Prime Coat 10-12-2011 4:10 Paint Car - Prime Coat 318 Hours
#21 Paint Car - Finish Coat 10-14-2011 9:09 Paint Car - Finish Coat 334 Hours
#22 Painting Trunk & Gas Tank 10-25-2011 9:14 Painting Trunk & Gas Tank 358 Hours
#23 Painting Wheel Rims 10-28-2011 3:52 Painting Wheel Rims 372 Hours
#24 Re-Installing Trunk Wires 11-09-2011 9:02 Re-Installing Trunk Wires 392 Hours
#25 Wheel-Well & Fender Treatment Again 11-10-2011 4:02 Wheel-Well & Fender Treatment,again 401 Hours
#26 Convertible Top Frame Rehab 11-16-2011 6:11 Convertible Top Frame Rehab 421 Hours
#27 Window Frames Rehab.  11-21-2011 5:26 Window Frames Rehab. 444 Hours
#28 Rehab. Window Regulators 11-21-2011 1:01 Rehab Window Regulators 448 Hours
#29 Windows Installation 11-24-2011 10:52 Windows Installation 464 Hours
#30 Floor Pan Treatment Again 11-30-2011 1:42 Floor Pan Treatment 468 Hours
#31 Misc. Putting VW Back Together 12-1-2011 7:38 Misc. Putting VW Back Together 488 Hours
#32 Hood, Deck & Fender Installation 12-2-2011 7:54 Hood, Deck & Fender Installation 506 Hours
#33 Lights Installation & Interior Painting 12-3-2011 9:20 Lights Installation 528 Hours
#34 Bumpers Installation & Misc. 12-12-2011 8:07 Bumpers Installation 548 Hours
#35A Convertible Top Installation 1-6-2012

#35B Convertible Top Installation 1-6-2012

8:54

8:44

Convertible Top Installation 578 Hours
#36 Rear Window Installation 1-27-2012 9:13 Rear Window Installation 604 Hours
#37A Interior Installation 1-31-2012

#37B Interior Installation 1-31-2012

7:59

8:53

Interior Installation 660 Hours
#38 Finish Exterior & Interior Photographs 2-11-2012 2:33 Finish Photographs 662 Hours
#39 Engine Work 12:56 Engine Work 682 Hours
#40 Final Photographs 6:44 Final Photographs _
#41 Specifications 7:28 Specifications _
#42 Electrical Details 13:50 Electrical Details _
#43 Cost Analysis 6:23 Cost Analysis _
Bug Jam 2012 - Voted #1 Class B1 Bug Division 0:46    

 Restoration #2 Complete, Any other work will be Normal Maintenance

 

Restoration #2 Complete, Any other work will be Normal Maintenance

 

Video Links

Video Clip

Duration

(Minutes)

Companion Text File (pdf)

Right Click to "Save As" on your Computer

Time Expended

(To Date)

Questions to malcolmbeasleysr@comcast.net