PREVIEW CLIPS
Below
are some preview clips of the 90 minute DVD “Operations on the Rochelle
Subdivision.” The clips are in mpeg1 and, while good quality and comparable to
VHS, are not near as high in quality as the DVD.
MPEGS
Here
are some Mpegs of the layout taken during Christmas vacation of 2000. All are
320X240 in the MPEG I format, except for the last three. These are high
resolution 720X480 in the MPEG I format. I strongly recommend a high bandwidth
connection to the Internet if you would like to download the entire set. A full
download with a 56K modem will take days to complete.
320X240 MEPG I
2. Westbound MPRNP exits staging, passes through Rochelle & Deshler and stops at Buhl station.
3. MPRNP switches the Buhl yard.
5. Westbound auto-rack train, AGMNP, passes Rochelle, Deshler, Buhl and stops in Mitford.
6. AGMNP power heads for fueling while yard crew switches train.
7. Eastbound CPBWE heads out of Rochelle bound for Milwaukee via Chicago.
9. MPRNP heads out of Buhl, passes through Mitford, and stops in Freemont.
11. MPRNP heads out of Freemont and continues
journey to North Platte via Clinton.
12. Rochelle switcher blocks car at UP/BNSF
interchange for incoming manifest freight train, MDVG2
13. MDVG2 heads out of staging, passes through
Freemont & Mitford, and stops in Buhl.
15. The Mitford Yard
crew switches MNPPR.
16. MDVG2 heads out of Buhl, passes through
Deshler, and stops in Rochelle.
17. MDVG2 switches cars at the Rochelle UP/BNSF
interchange track.
19. Eastbound Manifest Freight Train, MDACH,
exits staging and stops in Freemont.
20. CCEPB heads out of Freemont and continues
journey to North Platte via Clinton.
High
Resolution 720X480 MPEG I