Two Months In

IMG_0001.JPG
Chris the Mudder Guy made skip-trowel look easy, but I swear from too much experience that it's anything but.
IMG_0002.JPG
More carpet has been removed in preparation for tile work.
IMG_0003.JPG
The mudding and taping work seems to be all done.
IMG_0004.JPG
The microwave's fifth location.
IMG_0005.JPG
Winter in July? No, just a whole lot of sheetrock, joint compound, and topping dust in my dining room.
IMG_0006.JPG
The refrigerator cabinet waits in the carport, upside-down, since it has to be disassembled to be carried in and put into place.
IMG_0007.JPG
Reason #834 I love living in Montclair: it's black raspberry season!
IMG_0008.JPG
The pathetic pile on the left is what I've managed to split of the massive pile of logs on the right from the red oak that had to be removed from behind my house last summer.