Element
Jan/Feb
March/April
May/June
July/Aug
Sept/Oct
Nov/Dec
FGB / Zarya
Main hull completed
MDM's and development tools to be shipped to Russia
Node-1
Test hatch assembled
Welding ports to end bulkheads
Module cylinder welding underway
Welding complete, systems installation begins
3D modeling of module eases ECLSS production
Final welds made
Welding completed
Small/disadvantaged business produces station components
PMA-1
PMA-2
Service Module/Zvezda
Data System requirements approved
Module delay of 2 years anticipated
Z1 Truss
Qualification capture latch assembly begun
PDR reviews planned
PDR completed
Docking Compartment 1
P6 Truss
PV Arrays & Radiators
Shipments completed for MCSA
Software test & integration underway
Qualification tests of array drive motor completed
Radiator qualification unit construction underway
First drive motor delivered for assembly into E-Wing
Thermal Radiator Rotary Joint hoses complete testing
Prototype MDM's delivered for power system testing
Disconnect Couplings delivered for testing
Beta gimbal deployment transition structure tested
E-Wing testing completed
Active Thermal Control System radiator panel testing completed
PV array on-orbit assembly tested at Marshall
Mast canister tests completed
Solar panels tested with enginering model Sequential Shunt Unit
First flight mast canister completed
Science Power Platform
US Lab
Hull panels completed
Software Specifications Review completed
Welding begun on hull
MDM design review completed - production units to follow
Fore bulkhead and mid-cylinder welding completed
First version power system software delivered
CDR or Ku-band C&T completed
S-band system tested with TDRSS
Welding near completion
External Video system in acceptance testing
S-band construction underway
Hull completed
SSRMS
MPLM
US Airlock
S0 Truss
Rate Gyroscope Assembly delivered for shuttle test
Thermal testing completed on test article
S1 Truss
S1 mockup delivered to WETF for testing
Thermal radiator rotary joint mockup tested in WETF
Research Module 1
Spektr and Priroda proposed by Russia as ISS modules
Khrunichev has capability to build large modules, Energia small modules
Node 2 (US)
Welding underway
Circumferential welding begun
Hull welding complete, machining begun
Variable Polarity Pulsed Arc welding a success
Systems installation begun
Test units and mass simulators installed
Hatches being installed 1 per week
Internal structure being installed
P1 Truss
P3 Truss
P4 Truss
Docking & Stowage Module
JEM
Research Module 2
S3 Truss
S4 Truss
Life Support Module
APM (Columbus Orbital Facility)
COF to reuse MPLM ECLS and Service Module DMS-R
Phase-C/D development programme was submitted
European Robotic Arm (ERA)
Research Module 3
Centrifuge Accomidation Module
S6 Truss
US Habitation Module
CRV / CTV
CRV may evolve into CTV
European CRV/CTV on hold
Phase A extension studies
ESA halts CTV project, studies to continue
ARD
Mission design, component fabrication underway
Splashdown test success after 30km drop failed
ATV
Modular design to allow multi-mission role, landing system contracts
ATV incorporated into ISS plans
Soyuz TM
Progress M2
LTV
Astronaut Activities
International Cooperation & Program Management
IGA & MOU's
Boeing contract for ISS design & development complete
Increased costs and delays loom over ISS
ESA contributions cut to match funding levels
Annual IDR complete
Goldin sets May deadline for Russian financial committment to ISS
Russian funding crisis may force Russia out of ISS
ESA passes NASA deadline for Contributions committment
GAO report says ISS on schedule and under budget
Gore & Chernomyrdin to discuss ISS
Updated Assembly Sequence approved
RSA studies Mir-Alpha union to form ISS
Mir-Alpha plan announced by Khrunichev
Mir-Alpha would save on costs of ISS
RSA makes official Mir-Alphs proposal
NASA plans to ignore past Russian promises, but keep Russia in critical path
RSA presents Mir-Alpha plan to NASA JSC