| Upper Level Started |
| I finally started construction of what will be the upper visible portion of the layout. I started on the south end in the front of the room, Track from staging
will come out of cut and under a highway bridge to the point of becoming visible. |
 |
 |
| As it breaks into visible trackage, it curves across the room to the right and onto the first town which will have a passing siding, a feed store, and a siding
with livestock pens. |
|

|
| I'm using plaster over cheesecloth as the scenery base for the hills. The section in the far right is removeable so I can build and landscape it then install it
and tie it in to the rest which you see here in progress. The gap visible will be closed when the removeable section is permanently installed. |
|

|