| The first six pages here cover
the initial construction of the
observatory in 2001. These pages cover mainly the two roll-off-roof buildings. For details of the dome construction in 2006, skip to here. |
| |
Construction |
(1 of 6) |
The ground plan was laid out at the site in March. Concrete
for
the pier bases and storage shed/patio area was poured in mid-April, and
then Kramer Lumber of
Frankfort put up the storage shed (we did that first so we'd
have a place to store construction tools).
![]() Aluminum plates were placed over the piers |
![]() The storage shed/warming room and patio |
Real construction began on May 5. The post holes were dug with a tractor mounted auger and the bottom 3 1/2 feet of each treated 4X4 post was coated with tar. Double posts were bolted together for added strength at the corners. Then the posts were dropped in the holes.
![]() Thank God for power tools! |
![]() At this point we called it "Woodhenge"! |
![]() |
![]() |
The first day's work crew (l-r)- John Mahony, Craig Overman, Russ Kaspar, Cal Brallier, Jerry Seager, Hoppy Bray, and also photographer George Wyncott. Catering by Susan "Susie Homemaker" Kaspar.
![]() |
||
![]() |