![]() | ||||
Jan 11 2003 - Ready for the last riveting session in the jig. The gear boxes are installed and all riveting that I could do alone (along the main longeron) is finished. | ||||
![]() | ||||
In preparation for the big flip, I made some legs that attach to the false spar blocks. These are just some square steel with allen head cap screws into the spar blocks. | ||||
![]() | ||||
One last view before the finale. I used as many clecos as possible to hold the gear box assemblies tight in the fuse. | ||||
![]() | ||||
A final view looking aft. | ||||