![]() | ||||
Feb 9 2003 - Started in on the flooring. The front removable section is riveted together along with the reinforcement angle and stiffener below. The rear passenger footwells are also riveted on. | ||||
![]() | ||||
A view of the rear floor section. I have not riveted the stiffeners on yet to ease the installation and removal of the floor pieces. It is hard enough as it is with the ability to bend the sheets. | ||||
![]() | ||||
Feb 16 2003 - I finished up fitting the rear flooring including the stiffeners (minus the front three). The flap bearing blocks are drilled and I installed the arm rests. | ||||
![]() | ||||
Another view of the arm rests. I'm waiting for some parts to come in the mail to finish up with the nutplates, so I'll start fabricating some more parts needed down the road. | ||||
![]() | ||||
I fit the ground adjustable rudder pedal mounting rails and assembled the pedals, master cylinders, and other parts shown. | ||||
![]() | ||||
A view from above of the pedal assembly. | ||||
![]() | ||||
This is where I decided to run the cables to the tail light and strobe. | ||||
![]() | ||||
Here the wiring run is attached to a stiffener that runs down the center of the bottom skin. | ||||
![]() | ||||
This is the rearmost bay where the wires exit and are secured to the nylon block before running forward. | ||||