![]() | ||||
All the parts inventoried and ready to start. I have not built the jig at this point, but that is to come soon enough. | ||||
![]() | ||||
The front HS spar assembly riveted together with the attach angles fabricated and bent to the correct angle. | ||||
![]() | ||||
The HS skeleton riveted together and fit to the jig. The jig has a wire strung across the top and a couple plumb bobs hanging down to ensure the assembly is straight and true in the jig. | ||||
![]() | ||||
The HS skins installed and ready for riveting. I lost the finished HS picture, so this is the last one until the final set showing the entire empennage assembly. | ||||