![]() | ||||
The rudder skins with the stiffeners installed. | ||||
![]() | ||||
The almost completed rudder assembly. The counterweight has been installed and I am still working on the control horm brace at the bottom. | ||||
![]() | ||||
The rudder control horn brace going in. I was able to use AN470 rivets where the clecoes are shown here by using the longeron yoke in the squeezer. | ||||
![]() | ||||
Empennage total time: 196 hrs. (I never claimed to be speedy!) | ||||