Aug 4 2002 - Final preparations before the bottom wing skins are riveted on. I made a support bracket for the electrical conduit where it spans above the aileron pushrod. | ||||
![]() | ||||
Another view of the brace, this time from the bay just outboard of the bellcrank. | ||||
![]() | ||||
Flap hinge pin retainer. I went with the 4 eyelet removal technique and installed a #8 platenut on the flap brace to secure the pins. Here is a shot without the securing hardware. | ||||
![]() | ||||
Here the pins are held in with a #8 cap screw and two pieces of hinge material to secure the pins. | ||||
![]() | ||||
A view of the vent installed with Proseal and a few AN426A soft rivets. I thought it would be easier now than after riveting on the skins, hopefully it won't get in the way though when riveting. | ||||
![]() | ||||
Another view of the modified conduit routing. A string cable pull can either be blown through or pulled with a vacuum prior to pulling the wires with the string leader. | ||||
![]() | ||||
Sep 06 2002 - Primed the tank end ribs and rear baffle area. Installed tanks with all hardware. Installed access plates on bottom of wings. | ||||
![]() | ||||
Finished up the wing cart and moved the wings to their new home. Fuselage kit arrived a couple days ago - perfect timing. | ||||