Oct 29 2003 - I moved on to the forward sides. Another shot of the preparation. As in many cases, the prep work far outweighs the actual spraying and placement of the fabric.

The LH side complete with the panels back in place.

And the RH side. Next up is the area between the spar channel and the gear boxes. The top parts will be the most difficult with the fabric straddling the panel up top. I'll double check the templates before cutting these pieces.

Oct 31 2003 - I finished up the side upholstery. Like the other panels, I continued cutting the fabric to exact size with clean edges rather than fit oversize and then trim.

The RH console side. I like the looks of just staying within the flanges.

On overall shot of the rear seat area. I'll add non-skid material to the floors where the passenger feet go - both in the well and aft on the flat flooring.

The front cockpit. I have not decided what to do with the pilot floor yet - I just have some junk carpet in place to keep the floors relatively unscathed.

Mar 23 2004 - Upholstered the baggage compartment sides and floor. I won't do any of the other walls at this time.

<back home next>