Friday, September 7
In September, we finally completed our 3-season porch remodel. The front porch light was updated, the doorbell rewired to the front porch door, the bead-board ceiling was replaced with newly stained beadboard, the porch floor boards were patched, the porch crawlspace was vented, all wood surfaces were scraped/sanded/painted/stained, and the last few sunny days of Fall were ours to enjoy.


