Monday, October 18, 2004
Martin came over as did Brian Oeschger. The 3 of us ripped out the laundry room. This room is going to be retro fitted into a utility room.
Martin and I got the washer and the dryer into the shop and working (a 3-trip and multi-beer affair). On the next day (today) I cut out the subfloor. The previous owners had some water damage from a washing machine failure and the flooring was not properly repaired.
It looks like I will have to cut out some of the underlayment as well. HVAC starts in a couple of weeks and we have to have this room ready to go.
Martin and I got the washer and the dryer into the shop and working (a 3-trip and multi-beer affair). On the next day (today) I cut out the subfloor. The previous owners had some water damage from a washing machine failure and the flooring was not properly repaired.
It looks like I will have to cut out some of the underlayment as well. HVAC starts in a couple of weeks and we have to have this room ready to go.
