Saturday, November 13, 2004

Electrical passed inspection. We have a framing inspection scheduled for Monday. The porch has been about 80% framed. The rest of the ceilings in the main level have been dropped. Some of the interior framing has started.

I bought insulation for the ceiling and started that project today.

Here are some of the latest pics:








A little load of insulation. Our old carpet pad. Suppose this needed replacing?








Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?