Monday, November 15, 2004
The framing inspection did not go well. Robert was a no show and the inspector didn't even finish, as there were things that were incomplete (such as wind wash).
To top it off, the inspector told us that we had to take down all the insulation that I spent all weekend putting up. Robert called the department head and was able to stave that off - for now.
I feel like spitting nails.