Monday, November 15, 2004
I insulated the attic space this weekend. I got about 90% of it done. I had to finish installing the venting that Josh did not do.
Some things need to be completed upstairs:
Some things need to be completed upstairs:
- Sydney's closet has some 2x4's that are not in alignment - this will cause drywall issues.
- Wind wash is not installed all the way around the house.
- The doorway to Sydney's bathroom does not have the bottom plate cut out yet.
- Soffits are not completed.
- Fascia is not completed.
- Sheathing is not properly fastened all the way around.
- There are spots where the sheathing is not butted tight to one another.
- Low voltage (cable, phone, ethernet) needs to be installed.
- Plumbing is not completed - there are no water pipes at all, just drain & vent pipes.
- HVAC is not done.
- Stairs and stair landing are not framed yet.
- Bottom of 'kickout' (immediately above doorway) is not framed.
- Parts of the house are not closed to the outside - certain areas where 2 roof pitches are joined need to be enclosed.
We have the framing inspection today.