McKinley pulling ribs from the steam box.
|
|
She clearly no longer needs me in the process. Seeing
as a large part of starting this project was for us to build a boat
together, it was really great to have her both involved and interested.
|
|
|
Nearly done with the ribs.
|
|
The frame with all of the ribs, except one. We tried
to bend rib 1 about 10 times with no success. We decided we would use
a 2-part rib there instead.
|
![]() |
![]() |
The ribs pegged, but not trimmed.
|
|
Pegging the ribs.
|
![]() |
![]() |
The bow stem, rib #1, and keelson.
|
|
Rib #1 installed as a two-piece rib.
|
![]() |
![]() |
The bow "cutwater".
|
|
The stern and keelson. There are a couple of temporary
spacer blocks in between the keelson and the last few ribs. We are now
about 17 hours into the build.
|
![]() |