Phase One The bench is built on a basic 4x8
table.
In this phase the mountains and track and track bed has been laid
out.
Options for expansion exist to expand out and down into a larger
layout!
This phase was completed in less then 10 days, from start of bench
to a completely
functioning layout with 2 routes.
Phase 2, doing the ground cover and scenery has
just begun.
Phase 3 is adding the realistic buildings and scenes.
Here is a graphic of the finished product after phase 3 Continue to Phase 2 and 3
As a personal endorsement, I have NEVER enjoyed building any
modeling kit as much
as I have building Woodland Scenics Layout Kit. Nothing is
pre-fabricated, so I was able
to customize it to exactly my needs. I know from past
experience that building mountains,
inclining grades and track layout is a long building process.
In just one evening I was able
to build the basic base road bed for the track and in a second
evening was easily able to
build the graded inclines for the second level. I cannot speak
highly enough of their products!