Phase 2 and 3 Still under construction but we have15 Buildings built and the
painting process has begun.
Roads and Concrete Building Foundations are finished. The
River Section was just sealed and
is ready to color in. The base has been shaded with a earth
tone pigment. Creating the Stone Rocks
for the side of the mountains will begin this week. Track bed
still needs ballast; but the landscaping
will begin this week also. The city when finished will have a
a fully automated Traffic Signal System.
Street Lights are on order and will add interesting look to the city
at night. Below you can see
the 2 Lighted Crossing Signals Blinking as the crossing gates lower.
The Crossing Gates are
NJ International Signals that are Activated with CIRCUITRON
Detectors and animated with a
slow motion switch machine.
View Video of Crossing Gates Activated Here
(click on thumbnail for larger image)
Rock Face Details Rock faces that just got molded and the before
pictures of the locations that they will be attached! The after Picture to
follow soon!