Construction Log

January
2006
  • This page used to be called Countdown to Independence Junction. I had to pull my layout from the Layout Tour of the NMRA Convention because of (1) home renovations that are taking longer than expected; (2) additional responsibilities at work; (3) work on club layout for Layout Tour; and (4) an increased interest in virtual railroading via Trainz.
  • Work however is continuing, albeit at a slower pace, on the physical layout. I was able to purchase four more Tortoise switch machines with a gift certificate from one of my sons. Another son gave me a small grove of trees.
  • A couple of months back, I constructed tree backdrops from poly-fiber batting, cardboard, and ground foam. They look pretty good.
March
2005
  • Installed additional Tortoise motors on main track at Pembroke East
  • Replaced SwitchMaster motors on main track at Pembroke East with Tortoise motors to take advantage of contacts for eventual position indication feedback to PanelPro. 
  • Purchased 49 trees with Christmas gift certificate and temporarily "plated" them in Wycombe Village
February 2005
  • Removed old sink and pipes to make room for West Philadelphia staging
  • Completed yard throat to interchange/staging tracks on Farnsworth Module
  • Worked on new software for car forwarding using Microsoft Access
January
2005
  • Temporarily installed Farnsworth module on Cardington Branch to enhance operations until Millboure Mills is built (Phase II)
  • Repaired lumber shed for Mitchell Lumber & Co, Pembroke 
December 2004
  • Installed local switching panel at Pembroke East
  • Connected computer to LocoNet through LocoBuffer II
  • Installed DecoderPro software on computer
November 2004
  • Installed SwitchMaster motors in Pembroke East (3) and at Marshall Road (2)
  • Installed fascia board at Wycombe Village
October
2004
  • Worked on some backdrop ideas using Corel Draw 9
September
2004
  • Ballasted Fernwood Track
  • Installed fascia board at Fernwood and Pembroke
August
2004
  • Submitted Layout Information Form to NMRA for IJ 2006
  • Completed 6' section of backdrop for Fernwood area (photos)
Summer
2003
  • Operations: Phase 1
  • Wiring: Phase 1 (details)
  • Trackwork Construction: Phase 1 (photos)
2002
2003
  • Benchwork Construction: Phase 1 (photos)
Spring
2002
  • Track Plan: Phase 1 (details)
  • Concept