Cozy Mk IV #1334

Construction Photos

Chapter 7

Place Cursor Over Photo for a Description

 

070205 Beginning Chapter 7

 

070405 Building the NACA Scoop

 

070805 Plywood Pieces Floxed in Place

 

070905 Using the Router Trick on the Scoop

 

071505 Floxing Plywood Pieces Between Bulkheads

 

071605 Plywood Pieces Trimmed and Foam Installed

 

071705 Aft Portion of Scoop Constructed

 

071805 Foam Installed Between Bulkhead and Roughly Trimmed

 

072405 Aft End Foam Removed

 

072405 Foam Tapered to Area Removed

 

072405 Installation of LG Cover Hard Points

 

072505 Initial 45 Degree Cut Down Fuselage Corner

 

073105 Using the Famous Contouring Tool

 

073105 Left Side After Contouring 1

 

073105 Left Side After Contouring 2

 

081005 Glassed Bottom in Aft Right Corner

 

081605 Forward Scoop Section Glassed

 

081705 Depression for Landing Brake

 

082205 Completed Landing Brake and MB Antenna

 

082205 Antenna Solder Joint

 

082705 Completed Fuselage Bottom Layup 1

 

082705 Completed Fuselage Bottom Layup 2

 

082805 Canard Cutout

 

100405 Carving of the Upper Longeron

 

100505 Longerons Rounded to Shape of F28

 

101605 Fuselage on Rotisserie

 

101605 Rotisserie End 1

 

101605 Rotisserie End 2

 

102105 Passenger Side Layup 1

 

102105 Passenger Side Layup 2

 

102905 Pilot Side Layup(1)

 
Ron Springer