Below is a picture of three of the boats at the end of the first weekend of building. They need bulkheads, decks and the sailing rig is still being designed. We'll probably have a different rig for each boat. A fourth boat is under construction as well. It has the sides cut, chine logs installed and a mast (no pictures of it yet).
It looks like California finally has a fleet of puddle ducks (well, almost)!
Fleet
News:
|
SF Bay Ducks Marina |
![]() |
The bare hulls at the end of first weekend |