Well, this project has been in the
thoughts and plans since we first moved in, and it only took us 6 years to start
it. You can say it all started when Tom was able to get a great deal on a new
storm/screen door. From there, it has blossomed into a major project, and many
other great deals!
We have gone all out with a new door,
windows, insulation, electric, roof and shingles. As you will see, this has been
quite the undertaking... especially given the condition of the old work.
Honestly, the whole unit should
have been ripped off, and all new, but time and money would not allow for it.
The mice had been in the walls for
years, and evidence shows. The fact that there was not much of a sheathing (only
batten boards) and that the grade was so high did not help. A new PT sill
was installed, and 1/2" sheathing covered by 1/2" foil insulation. The
bottoms of the sheathing was capped with aluminum flashing to keep the mice away
(hopefully) and the grade lowered. Most of the framing was reconfigured, mainly
because of the door and window additions. The roof was completely reframed with
a 4 foot overhang, that will cover an added small porch. HardiPlank siding will
be going on soon, and PVC trip for the windows. Electrical has been roughed
inside, and outside will get two recessed lights in the soffit.
Enjoy!
click on photo for larger view
 |
 |
| Door Before |
Stairs Before |
 |
 |
 |
 |
 |
| |
|
|
|
|
 |
 |
 |
 |
 |
| Nice siding! |
Nice Framing! |
 |
 |
 |
 |
 |
| What's a ruler or level? |
When Mice Attack! |
 |
 |
 |
 |
| "Open Concept?" |
New Door, Window, Sheathing |
 |
 |
 |
 |
 |
| |
What the Heck? |
 |
 |
 |
 |
 |
| Off with the Old! |
Workin' a bit late?? |
Some Insulation |
 |
 |
 |
 |
 |
| New Roof and Shingles. Nice
Overhang! |
Some Electrical Work |
 |
 |
 |
 |
| New
storm door installed |
New HardiPlank siding going
on |
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|