Bathroom tiling Project - Winter 04

Bathroom
1. Start of project
  • existing shower tile had cracking/moldy grout
  • moldly area forming on wall near tub
  • Bathroom
    2. Cement Board:
  • ripped down all old tile and cement board
  • hanging new "Durock" cement board
  • Bathroom
    3. Floor:
  • floor was stained from water damage
  • removed toilet during project
  • ripped up flooring down to sub floor
  • Bathroom
    4. Backerboard:
  • installed new "Hardy Backerboard" to set floor tiles
  • Bathroom
    5. Tiling Floor:
  • floor tiles are cemented with Versabond thinset
  • Bathroom
    6. Tiling Walls:
  • wall tiles are cemented with Flexbond thinset
  • Bathroom
    7. Grouting Floor:
  • grout completed on floor
  • we can use our toilet again!
  • Bathroom
    7. Tiling Shower:
  • continued to install tile in shower over a few weekends
  • installing two shelves for shampoo, etc.
  • Bathroom
    9. Project is completed
  • we can shower upstairs again!!!