2005 Work

12/18/06

Up
Project Start
2003 Work
2004 Work
2004 Interior
2005 Work
2005 Plans
2006 Plans
2007 Plans
Future Plans
Before & After
Parts List
Modifications

 

2005 Work Photo Gallery                  

The main emphasis this year is interior renovations and repairs.  The top and interior restorations will be performed this year to make the car feel and look 100% better.

Electrical problems have kept the beast off the road.  Instrument cluster was inoperative, power was erratic, in short a real pain.  Replaced the ground from the battery to block, from the block to the chassis and all grounds in the interior.  It appears that this has fix the problem.

The speedometer drive gear needs to be replaced since we changed gears from 2.73 to 3.73.  The bottom of the car will receive a good cleaning and preparation for the sub-frame stiffeners to be added.

The upholstery job was a real chore, but the results are really dramatic.  Well worth the time, money and effort.

Old Carpeting

Old Carpeting

New Carpeting

Old Carpet

Rear view with new carpeting

Front Driver's Seat without Upholstry

New and Old

New and Old

New and Old

Old Rear Seat Back

New Rear Seat Back

Old Rear Seat

Old Rear Seat Bottom

New Rear Seat Bottom

Naked Rear Seat

Naked Rear Seat

Home | Project Start | 2003 Work | 2004 Work | 2004 Interior | 2005 Work | 2005 Plans | 2006 Plans | 2007 Plans | Future Plans | Before & After | Parts List | Modifications

This site was last updated 10/12/05