2006 Plans

12/18/06

Home
Project Start
2003 Work
2004 Work
2004 Interior
2005 Work
2005 Plans
2006 Plans
2007 Plans
Future Plans
Before & After
Parts List
Modifications

 

Plans for 2006

  • New top with glass, weather-stripping, well liner, boot and headliner

    • Estimate of $1,500 received and scheduled for March

    • Done

  • Sub-frame connectors and strut brace

    • Will order Maximum Motorsports full length connectors from 50Resto

    • Will take the car to a local shop for a chassis alignment

    • Scheduled for Spring 2007

  • 302 Stripe along the hood riser

  • Trunk work - enclosing the sides and rear and new carpeting

    • Carpeting in.

  • The front radiators will be pulled out and the fins straightened to improve cooling.  Also a new air-deflector will be installed.

  • The door hinge pins and rollers will be replaced to help the doors stay open.

  • Driver's side rear window has stopped working.  Will look at fixing or replacing it.  All windows need work, so the door panels will be removed and the windows repaired.

  • The car does not lock and I believe it is because the actuators are bad.  They will be looked at and replaced if necessary.

    • Replaced the actuators. Done

     

Home | Project Start | 2003 Work | 2004 Work | 2004 Interior | 2005 Work | 2005 Plans | 2006 Plans | 2007 Plans | Future Plans | Before & After | Parts List | Modifications

This site was last updated 12/17/06